Aluminium-framed glass facade systems for commercial buildings across Delhi NCR — structural glazing, curtain wall and spider glazing, engineered for wind-load, weather and the way a tower actually moves.
Four ways to glaze a building.
Structural glazing
Glass bonded to the frame (2- or 4-side) for a flush, frameless-looking glass skin.
Curtain wall (stick)
Assembled mullion-by-mullion on site — flexible for smaller or irregular facades.
Curtain wall (unitised)
Factory-built panels craned into place — fast, consistent, ideal for towers.
Spider / point-fixed
Glass held on stainless spiders for atriums, lobbies and shopfronts.
Engineered for the load.
| Wind-load | Framing and glass sized to the building's height and wind zone — the number that drives the whole design. |
| Glass | DGU for thermal performance, laminated where safety or overhead glazing needs it — toughened throughout. |
| Thermal / weather | Thermal breaks, gaskets and drainage detailing to keep heat out and water where it belongs. |
| ACP integration | Glazing and ACP cladding detailed together so the solid and glass zones align cleanly. |
Commercial buildings, mostly.
Facade cost is engineered, not off-the-shelf. What it turns on:
Facade FAQs.
Both are aluminium-framed glass facade systems. In structural glazing the glass is bonded to the frame so the outside reads as a flush glass skin; a curtain wall shows capped or pressure-plate framing lines. Curtain wall is often faster to install; structural glazing looks more seamless.
Stick systems are assembled panel by panel on site and suit smaller or irregular facades. Unitised systems arrive as factory-built panels for fast, high-quality installation on tall towers where site time is costly.
Framing and glass are selected for the building's height and wind zone, with DGU and laminated glass where performance or safety needs it. We engineer the facade for the load, not to a generic template.
A survey and design, engineered shop drawings, glass and framing procurement, then a phased installation coordinated with the main build. We handle it as a single package.
This is the single home for facade glazing across the site. For the solid elevation skin see ACP cladding; for punched openings rather than a full glass wall, see aluminium windows.